2019

2019

First projects outside the Benelux and start of wind tunnel assessments

Until 2019, Actiflow conducted wind studies exclusively using numerical simulations. That year, Actiflow began collaborating with the UK’s Building Research Establishment (BRE), gaining access to a wind tunnel for studying wind loads on façades and building structures. This collaboration enabled Actiflow to complete its first projects for clients in the United Kingdom and Gibraltar. After BRE’s wind tunnel closed, Actiflow signed an agreement with Imperial College London for the use of their wind tunnel facilities.